Thursday, May 1, 2014

Glunk Site

May 1st,2014
        Today we got a late start because on an early afternoon thunderstorm. Also, we started at around 2 because Robin wanted us to meet some of the members of NCC8. We continued on digging with the members, and we met Andy, who has a formal degree in archaeology. Also Matt was introduced to us, and he took the same class as we are with Robin. It was a very productive day as Sam and I hit a new level in the soil, marked by a lighter yellow colored soil. While digging at level 1 I found a large limestone block (8x6x2.5 in). The large limestone brick was 14 inches deep, but it was to only one we found in level 1. We also uncovered a small brick protruding from the North west wall at the depth of 9 in.